Inside the 1970s the Paeroa factory was upgraded, rising the ground Area to one,115 square metres (12,000 sq ft). All-around this time, a different spring water pipe was positioned among the Paeroa factory and also the Railway Reserve, which pumped filtered Paeroa spring water, allowing the general